The execution phase is where the design comes to life. It involves coordinating labor, materials, and timelines to transform the approved concept into reality. Below is a step-by-step breakdown of end-to-end execution in an interior design project.
Before work begins, ensure everything is in place:
Approved floor plans, elevations, and 3D renders.
Detailed working drawings (electrical, plumbing, carpentry).
Assign carpenters, electricians, painters, plumbers, etc.
Conduct a pre-construction meeting to align on timelines and responsibilities.
Confirm lead times for all materials (tiles, furniture, lighting, etc.).
Schedule deliveries to avoid site congestion.
The actual construction follows a structured sequence to avoid rework.
Remove old fittings, walls, flooring, etc.
Structural modifications (e.g., false ceilings, partition walls).
Electrical wiring, switches, and socket placements.
Plumbing lines for sinks, showers, and drainage.
HVAC ducting (if applicable).
Tile/stone/marble installation (floors, walls, countertops).
Waterproofing in wet areas (bathrooms, kitchens).